CONTACT
The Boat
1970-2007
Phase 1
Phase 2
Phase 3
Phase 4
Reference Pictures
3/10/14: Thinking About Molding
3/21/14: Frames or No Frames
4/14/14: Cabin Prep
4/21/14: Tanks
4/27/14: Keel, Ballast, Bilge
5/4/14: More Time in the Bilge
5/15/14: Floors, Engine, and Engine Compartment
5/25/14: Engine Bed and Bilge
6/2/14: Bilge, Main Bulkhead, and Compression Posts
6/17/14: Bulkheads, Engine Bed, Engine Move
6/8/14: Tank Discussion
6/22/14: Bilge Bulkhead, Tanks, Compression Posts
7/6/14: Tanks, Compression Block
7/3/14: Tanks
7/29/14: Tanks, Compression Posts
8/17/14: Floor Beams
10/5/14: Frame and Cover
4/23/15: New Frame
5/26/15: Frame and Tarp
7/26/15: Scaffolding
7/27/15: Teak Rails (part I)
2/26/16: Teak Rails (part II)
3/22/16: Forepeak and Samson post
3/27/16: Decision and Prep
4/4/2016: Modifications Discussion, Bulkheads, Scarf Jig/Joints
4/10/16: Bulkheads, Floor Beam
4/17/16: Bulkheads
4/26/16: Through Hulls, Bulkhead Tabbing, Galley
5/1/16: Galley Bulkheads
5/14/16: Icebox
5/22/16: Icebox
6/5/16: Aft Hatch, Icebox, V-berth Bulkhead
6/19/16: Icebox, Shelves, Seats, Aft-compartment Bulkhead
7/4/16: Sink Area, Shelves, Compression Post, Holding Tank, Forpeak
7/17/16: Misc., Icebox, Holding Tank
8/21/16: Holding Tank
9/11/16: Forepeak
9/26/16: Head Area
4/11/17: Supplied-air Respirator
5/22/17: Forward Cabin
6/4/17: Storage Fronts and Lids
7/13/17: Ceiling, Sides, and Hatches
7/23/17: Ceiling, Hatches, and Head Compartment
8/3/17: Galley
8/13/17: Galley
9/1/17: Galley and Head Area
10/7/17: Engine Compartment, Door Openings, Tanks
10/16/17: Engine Enclosure, Shower Stall, Toilet Step
10/24/17: Cabin Sole
11/26/17: Companionway Ladder
4/24/18: Hull Lining
6/7/18: Floors, Keel, Misc.
6/17/18: Toe Rail, Cap Rail
6/23/18: Cap Rails
7/8/18: Exterior Wodwork I
7/18/18: Exterior Woodwork II
8/5/18: Exterior Woodwork III
8/15/18: Exterior Woodwork IV
8/30/18: Mast Step, Dorade, Samson Post, Handrails, Etc.
9/5/18: Chain Plates, Masts, Grab Rails
9/25/18: Mast, Deck
10/23/18: Dinghy, Grab Rails, Masts
11/13/18: Varnishing, Masts
12/6/18: Odds And Ends, Head Cabinetry
12/27/18: Face Frames
1/30/19: Cowl Vents
2/9/19: Cockpit Gratings I
3/17/19: Cockpit Grating II
4/7/19: Cockpit Sole, Masts
5/12/19: Cockpit Drains
6/5/19: Cabinetry
6/22/19: Bottom, Dinghy, Rails
7/15/19: Varnishing
7/14/19: Varnishing II
7/28/19: Rudder
8/22/19: Rudder, Deck, Topsides, Stripes, Scrolls
9/8/19: Scaffolding, topsides
9/29/19: Topsides, Stripes
10/14/19: Bottom
11/10/19: Rudder, Exhaust
2/26/20: Ruckle
3/13/20: Engine
4/19/20: Engine
5/3/20: Hatches
5/10/20: Hatches II
5/31/20: Hatches III
6/14/20: Booms
7/5/20: Spars
7/24/20: Spars, Genoa/Traveler Track
8/9/20: Spars
8/23/20: Handrails, Hatches IV, Misc
9/7/20: Painting, Misc
9/19/20: Painting, Grab Rails
10/11/20: Interior, Misc
10/26/20: Hatches, Ladder
11/21/20: Windows
12/13/20: Windows
12/27/20: Cabinetry, Dorade Boxes
1/8/21: Cabinetry, Electrical
1/23/21: Panel frames, Salon furnishings, Lifeline system
2/22/21: Table and Doors
3/14/21: Cabinetry
4/18/21: Battery Boxes, Trim
5/2/21: Track, Electrical, Trash
5/14/21: Molding, Trim
6/25/21: Miscellaneous
8/30/21: Moving
9/9/21: New Space
10/02/21: The New Normal
10/23/24: The Cabana
11/13/21: Cabana Pt. 2
12/27/21: Upholstery, Electrical
3/20/22: Dinghy Trailer
6/28/22: Swim Platform
8/21/22: Dome Lighting
11/19/22: Under Cockpit
12/14/22: Chainplates, Stem Fitting, Panel and Frame
3/11/23: Through Hulls, Wiring Panels
3/18/23: Rudder, Head Plumbing
3/26/23: Head Plumbing, Engine
4/2/23: Bilge Plumbing
4/9/23: Freshwater Plumbing, Hot Water Heater
4/16/23: Engine, Water Heater, New Tank Gaskets, Pedestal
4/23/23: Pedestal, Shifter
4/30/23: Deck Hardware, Winches
5/7/23: Spray Hood, Drop Boards
5/14/23: Nav Lights, Chain Locker Door, Other Door
5/21/23: Stove, Propane System, Stern Light, Mizzen Pad Eyes
5/28/23: Doors, Hatches
6/4/23: Steering
6/11/23: Outlets, Rubrail Guard, Doors, Stern Tube
6/17/23: Engine, Drivetrain, Control Cables, Garboard Drain, Cockpit Drains, Steering Stops
6/25/23: Floorboards, Upholstery, Emergency Tiller, Cover, Stanchions, Lifelines, Hanging Lockers
7/2/23: Varnishing, Bottom Paint
7/9/23: Cockpit Hatch Drains, Masts and Rigging, Rope and Chain Inventory
7/17/23: Bow Roller, Companionway Lock, To-do List, Miscellaneous
7/24/23: Decks Nonskid
7/29/23: Launch, Sail
8/8/23: Cruise
Lecture Slides
CONTACT
The Boat
1970-2007
Phase 1
Phase 2
Phase 3
Phase 4
Reference Pictures
3/10/14: Thinking About Molding
3/21/14: Frames or No Frames
4/14/14: Cabin Prep
4/21/14: Tanks
4/27/14: Keel, Ballast, Bilge
5/4/14: More Time in the Bilge
5/15/14: Floors, Engine, and Engine Compartment
5/25/14: Engine Bed and Bilge
6/2/14: Bilge, Main Bulkhead, and Compression Posts
6/17/14: Bulkheads, Engine Bed, Engine Move
6/8/14: Tank Discussion
6/22/14: Bilge Bulkhead, Tanks, Compression Posts
7/6/14: Tanks, Compression Block
7/3/14: Tanks
7/29/14: Tanks, Compression Posts
8/17/14: Floor Beams
10/5/14: Frame and Cover
4/23/15: New Frame
5/26/15: Frame and Tarp
7/26/15: Scaffolding
7/27/15: Teak Rails (part I)
2/26/16: Teak Rails (part II)
3/22/16: Forepeak and Samson post
3/27/16: Decision and Prep
4/4/2016: Modifications Discussion, Bulkheads, Scarf Jig/Joints
4/10/16: Bulkheads, Floor Beam
4/17/16: Bulkheads
4/26/16: Through Hulls, Bulkhead Tabbing, Galley
5/1/16: Galley Bulkheads
5/14/16: Icebox
5/22/16: Icebox
6/5/16: Aft Hatch, Icebox, V-berth Bulkhead
6/19/16: Icebox, Shelves, Seats, Aft-compartment Bulkhead
7/4/16: Sink Area, Shelves, Compression Post, Holding Tank, Forpeak
7/17/16: Misc., Icebox, Holding Tank
8/21/16: Holding Tank
9/11/16: Forepeak
9/26/16: Head Area
4/11/17: Supplied-air Respirator
5/22/17: Forward Cabin
6/4/17: Storage Fronts and Lids
7/13/17: Ceiling, Sides, and Hatches
7/23/17: Ceiling, Hatches, and Head Compartment
8/3/17: Galley
8/13/17: Galley
9/1/17: Galley and Head Area
10/7/17: Engine Compartment, Door Openings, Tanks
10/16/17: Engine Enclosure, Shower Stall, Toilet Step
10/24/17: Cabin Sole
11/26/17: Companionway Ladder
4/24/18: Hull Lining
6/7/18: Floors, Keel, Misc.
6/17/18: Toe Rail, Cap Rail
6/23/18: Cap Rails
7/8/18: Exterior Wodwork I
7/18/18: Exterior Woodwork II
8/5/18: Exterior Woodwork III
8/15/18: Exterior Woodwork IV
8/30/18: Mast Step, Dorade, Samson Post, Handrails, Etc.
9/5/18: Chain Plates, Masts, Grab Rails
9/25/18: Mast, Deck
10/23/18: Dinghy, Grab Rails, Masts
11/13/18: Varnishing, Masts
12/6/18: Odds And Ends, Head Cabinetry
12/27/18: Face Frames
1/30/19: Cowl Vents
2/9/19: Cockpit Gratings I
3/17/19: Cockpit Grating II
4/7/19: Cockpit Sole, Masts
5/12/19: Cockpit Drains
6/5/19: Cabinetry
6/22/19: Bottom, Dinghy, Rails
7/15/19: Varnishing
7/14/19: Varnishing II
7/28/19: Rudder
8/22/19: Rudder, Deck, Topsides, Stripes, Scrolls
9/8/19: Scaffolding, topsides
9/29/19: Topsides, Stripes
10/14/19: Bottom
11/10/19: Rudder, Exhaust
2/26/20: Ruckle
3/13/20: Engine
4/19/20: Engine
5/3/20: Hatches
5/10/20: Hatches II
5/31/20: Hatches III
6/14/20: Booms
7/5/20: Spars
7/24/20: Spars, Genoa/Traveler Track
8/9/20: Spars
8/23/20: Handrails, Hatches IV, Misc
9/7/20: Painting, Misc
9/19/20: Painting, Grab Rails
10/11/20: Interior, Misc
10/26/20: Hatches, Ladder
11/21/20: Windows
12/13/20: Windows
12/27/20: Cabinetry, Dorade Boxes
1/8/21: Cabinetry, Electrical
1/23/21: Panel frames, Salon furnishings, Lifeline system
2/22/21: Table and Doors
3/14/21: Cabinetry
4/18/21: Battery Boxes, Trim
5/2/21: Track, Electrical, Trash
5/14/21: Molding, Trim
6/25/21: Miscellaneous
8/30/21: Moving
9/9/21: New Space
10/02/21: The New Normal
10/23/24: The Cabana
11/13/21: Cabana Pt. 2
12/27/21: Upholstery, Electrical
3/20/22: Dinghy Trailer
6/28/22: Swim Platform
8/21/22: Dome Lighting
11/19/22: Under Cockpit
12/14/22: Chainplates, Stem Fitting, Panel and Frame
3/11/23: Through Hulls, Wiring Panels
3/18/23: Rudder, Head Plumbing
3/26/23: Head Plumbing, Engine
4/2/23: Bilge Plumbing
4/9/23: Freshwater Plumbing, Hot Water Heater
4/16/23: Engine, Water Heater, New Tank Gaskets, Pedestal
4/23/23: Pedestal, Shifter
4/30/23: Deck Hardware, Winches
5/7/23: Spray Hood, Drop Boards
5/14/23: Nav Lights, Chain Locker Door, Other Door
5/21/23: Stove, Propane System, Stern Light, Mizzen Pad Eyes
5/28/23: Doors, Hatches
6/4/23: Steering
6/11/23: Outlets, Rubrail Guard, Doors, Stern Tube
6/17/23: Engine, Drivetrain, Control Cables, Garboard Drain, Cockpit Drains, Steering Stops
6/25/23: Floorboards, Upholstery, Emergency Tiller, Cover, Stanchions, Lifelines, Hanging Lockers
7/2/23: Varnishing, Bottom Paint
7/9/23: Cockpit Hatch Drains, Masts and Rigging, Rope and Chain Inventory
7/17/23: Bow Roller, Companionway Lock, To-do List, Miscellaneous
7/24/23: Decks Nonskid
7/29/23: Launch, Sail
8/8/23: Cruise
Lecture Slides
Menu
Close
Ruckle Restoration
1970 Cheoy Lee Offshore 40 (Previous Names: (1971) Fair Dinkum IV, (1975) Thalassa)
CONTACT
Comments or questions are welcome.
*
indicates required field
Name:
*
Email:
*
Subject:
*
Message:
*
CAPTCHA Code:
*
© 2024
Ruckle Restoration
. Theme by
Anders Norén
.